(737) 341-6611

Whole-Home Remodeling in Austin, TX

Kitchens, bathrooms, flooring, walls, and exteriors under one contract, one crew, and one person who answers the phone — with a fixed written price before demolition day.

  • One contract, one crew
  • Fixed written pricing
  • Permits & inspections handled
  • Licensed & insured in Texas
Free on-site estimatesFixed-price written contractsLicensed & insured in TexasEnglish & EspañolPermits handled for you

Quick Answer

What does a whole-home remodel cost in Austin?

A cosmetic whole-house update — flooring, paint, fixtures, and finishes throughout — commonly runs $60,000–$120,000 on a typical Austin home. Once kitchens, bathrooms, and layout changes are included, most projects land $150,000–$400,000+. The honest answer is that it depends entirely on scope, and we will not pretend a number exists before we have walked your house.

Why one contractor matters

One Remodeling Contractor Beats Six — Here Is Why

Six separate contractors means six schedules, six invoices, and six people pointing at each other when something does not line up.

The tile guy is waiting on the plumber. The plumber is waiting on the electrician. The cabinets arrived while the floors were still curing. Nobody is technically at fault, and your project quietly loses five weeks.

We run the whole thing: demolition, framing, electrical, plumbing, HVAC, drywall, flooring, cabinetry, tile, paint, and the permits that tie them together. The sequencing is our problem, not yours — and that is where the schedule and the budget are actually won.

  • Kitchens and bathrooms remodeled as part of the whole plan
  • Flooring throughout — tile, luxury vinyl plank, hardwood
  • Wall removal, framing, and engineered structural beams
  • Full electrical and plumbing updates by licensed trades
  • Drywall, texture matching, and interior paint
  • Exterior, siding, and curb-appeal work in the same contract
Open-concept kitchen remodel by House Genius, part of a whole-home renovation in Austin, TX

Scope levels

Three Levels of Whole-Home Remodeling — and What They Cost

We will tell you honestly which one actually gets you the house you are describing.

🎨

Cosmetic Refresh

New flooring throughout, full interior paint, updated lighting, fixtures, and hardware. Same layout. The best dollar-for-impact option, usually 6–10 weeks.

🔧

Major Remodel

Kitchen and bathrooms rebuilt, flooring replaced, electrical and plumbing updated, some walls opened. Four to six months. This is most of what we do.

🏗️

Full Gut Renovation

Down to the studs. New layout, new systems, new everything — often with an addition. Six to twelve months, architect and engineer included.

How It Works

How a Whole-Home Project Runs

Long projects fail on communication, not craftsmanship. We over-communicate on purpose.

Walk-Through & Scope

We walk every room with you, measure, and separate what you want from what the house actually needs. Nothing gets priced before this.

Fixed Line-Item Quote

Room by room, trade by trade, with allowances stated in writing. You see exactly where the money goes before you sign.

Phased Construction

A posted schedule, dust barriers between zones, daily cleanup, and a weekly update so you always know what happens next week.

Punch List & Warranty

We walk it with you room by room, fix everything on the list, and back the workmanship in writing.

Answers

Whole-Home Remodeling Questions from Austin Homeowners

What does a whole-home remodel cost in Austin?

A cosmetic whole-house update — flooring, paint, fixtures, and finishes throughout — commonly runs $60,000–$120,000 on a typical Austin home. Once kitchens, bathrooms, and layout changes are included, most projects land $150,000–$400,000+. The honest answer is that it depends entirely on scope, and we will not pretend a number exists before we have walked your house.

Is it cheaper to remodel or to move?

That is your call to make with your own numbers — we are contractors, not financial advisors. What we can tell you is the real construction cost of getting the house you want, so you are weighing that against realtor fees, closing costs, and current Austin prices instead of guessing at both sides.

Can we live in the house during the remodel?

Often yes, if we phase it. We seal off zones with dust barriers, keep one working bathroom and a temporary kitchen area live, and sequence the work so you always have somewhere to sleep and eat. For a full gut, moving out for the middle stretch is usually faster and cheaper overall — we will tell you which case you are in.

How long does a full remodel take?

Cosmetic whole-house work: 6–10 weeks. A full remodel involving kitchens, baths, and layout changes: 4–8 months, plus permitting time up front. Anyone promising a gut renovation in six weeks is telling you what you want to hear.

Do you handle design, or do I need an architect?

For most remodels we handle design in-house. If you are moving structural walls, adding square footage, or building an addition, we bring in an architect and a structural engineer — and we manage them, so you still have one point of contact.

How do payments work on a large project?

Milestone draws tied to completed, inspected stages of work. You never pay a large sum for work that has not been performed. Every draw is defined in the contract before we start.

Service Area

Serving Austin and 35 Miles Around It

If you are within about 45 minutes of downtown Austin, we can be at your home for a free on-site estimate — usually within 48 hours.

Get a Real Number on Your Whole-Home Remodel

Tell us what you are picturing on WhatsApp. We will give you a realistic range before we ever set foot in the house.

Call NowWhatsApp