Garage Conversions & ADUs in Austin, TX
Turn dead square footage into a guest suite, a home office, or a rentable second unit — designed, permitted, and built by one team from parcel research to final inspection.
- Zoning checked before you spend a dollar
- Plans & permits handled
- Licensed & insured in Texas
- Fixed written pricing
Quick Answer
What does it cost to convert a garage in Austin?
A conditioned living space conversion — insulation, drywall, flooring, HVAC, electrical, windows — typically runs $35,000–$70,000. Adding a full bathroom and kitchenette to make it a true rentable unit pushes it toward $80,000–$140,000, because you are now running drain lines and meeting dwelling-unit code.
Start here
Before You Design an ADU, Find Out What Your Austin Lot Allows
We have met too many homeowners who paid an architect before anyone checked the parcel.
Austin ADU rules involve zoning district, lot size, setbacks, impervious cover limits, heritage trees, and whether your lot has an existing easement problem. Any one of those can shrink or kill a project after you have already spent money on drawings.
So we start backwards from how most people do it: we pull your parcel, check it against current code, and tell you what is actually buildable on your specific lot. Then we design to that. Then we price it.
- Attached garage converted to conditioned living space
- Detached garage converted to a guest suite or studio
- New detached ADU built from the ground up
- Kitchenettes, full bathrooms, and separate entrances
- Mini-split HVAC, insulation, and code-compliant egress windows
- Separate metering and utility routing where required
Reference PhotoThree paths
Garage Conversion or Detached ADU — Which Fits Your Lot?
Garage Conversion
Fastest and cheapest path to real square footage. Insulate, condition, finish, and add egress. Great for an office, gym, or teen suite.
Garage to Full Dwelling
Everything above plus a bathroom, kitchenette, and separate entrance — a legitimate second unit for family or rental, built to dwelling-unit code.
Detached New-Build ADU
Purpose-built in the back yard. Costs the most, keeps your garage, and generally produces the best unit and the strongest resale story.
How It Works
From Zoning Check to Final Inspection — Timeline and Cost
Feasibility Check
We pull your parcel and check zoning, setbacks, impervious cover, and trees against current City of Austin code — before you spend on design.
Design & Permit
Construction drawings, engineering where required, and full permit submittal. We manage the review comments and resubmittals.
Build
Foundation through finish with licensed trades, a posted schedule, and one point of contact who answers the phone.
Inspections & Handover
Every required inspection through final Certificate of Occupancy, then a walk-through and written workmanship warranty.
Answers
Garage Conversion and ADU Questions in Austin
What does it cost to convert a garage in Austin?
A conditioned living space conversion — insulation, drywall, flooring, HVAC, electrical, windows — typically runs $35,000–$70,000. Adding a full bathroom and kitchenette to make it a true rentable unit pushes it toward $80,000–$140,000, because you are now running drain lines and meeting dwelling-unit code.
Can I legally build an ADU on my Austin lot?
Many Austin lots allow one, but it depends on your zoning, lot size, setbacks, impervious cover, and tree ordinance — and Austin has changed these rules more than once in recent years. We check your specific parcel against current code before you spend anything on design. That research is the first thing we do, not an afterthought.
How long does an ADU take to build?
Plan on 4–8 weeks for design and permitting before ground breaks, then 4–7 months of construction for a detached unit. A garage conversion is much faster — often 8–14 weeks total, since the structure and foundation already exist.
Will an ADU actually pay for itself?
That depends on your numbers, your neighborhood, and the rental market — and we are contractors, not financial advisors, so we will not pretend to model your return for you. What we will do is give you a firm construction cost and a realistic schedule so you can run those numbers against real figures instead of guesses.
Do I lose my garage parking?
Yes, if you convert it. Before you commit, we look at whether a detached new-build in the back yard makes more sense for your lot — sometimes it costs more but keeps the garage and yields a better unit.
Who handles the plans and permits?
We do. Site plan, construction drawings, engineering where required, permit submittal, and every inspection through final. You are not standing in line at Development Services.
Service Area
Serving Austin and 35 Miles Around It
If you are within about 45 minutes of downtown Austin, we can be at your home for a free on-site estimate — usually within 48 hours.
- Austin
- Round Rock
- Cedar Park
- Pflugerville
- Georgetown
- Leander
- Lakeway
- Bee Cave
- West Lake Hills
- Buda
- Kyle
- Manor
- Bastrop
- Dripping Springs
- Hutto
- San Marcos
- Wells Branch
- Sunset Valley
- Rollingwood
- Elgin
Full Service Remodeling
Everything We Build in Central Texas
Find Out What Your Austin Lot Allows
Send us your address on WhatsApp. We will look at the parcel and tell you straight whether an ADU is realistic there.
